EXECUTION PORTFOLIO
Empirical Proof. Measured Precision.
In the construction industry, track records echo far louder than promises. Explore our execution archives—from fortifying vital facility structures to modernizing municipal utility networks—all accomplished with zero deviation.

Electrical Equipment & Spare Parts Procurement
Client
Makassar City Public Works Office
Value
IDR 5,914,999,960
Location
Makassar, South Sulawesi
Year
2021
The Challenge
Executing a massive-scale procurement requiring absolute supply chain management. This operation necessitated the supply of 179,715 meters of 2x10 mm Twisted cables, 58,800 meters of 2x16 mm cables, and 7,000 units of 50-Watt LED modules within a strict 90-day deadline without any delivery defect tolerance.
The Solution
We implemented precision logistics management. Distribution scheduling was fragmented into a rigid delivery matrix to guarantee that the cabling materials and LED modules landed at the Makassar Municipal Lighting Warehouse on schedule, securing the continuity of the city's illumination projects.

DENPOM Makassar Headquarters Rehabilitation
Client
Makassar City Public Works Office
Value
IDR 3,707,213,000
Location
Jl. Jend. Sudirman, Makassar City
Year
2021
The Challenge
Retrofitting a building dedicated to strategic military command. The primary challenge lay in executing structural works, architectural refinements, and MEP installations without disrupting the headquarters' daily security and operations.
The Solution
We enforced a zero-disruption protocol. The execution was divided into cross-phases, ensuring the stability of reinforced concrete in structural works ran parallel to the architectural restoration of the main office area. Handed over with 100% physical progress in December 2021.

Phase 2 Mercury to LED Street Light Replacement
Client
Regional Secretariat of Kendari City
Value
IDR 2,703,123,000
Location
Kendari City, Southeast Sulawesi
Year
2021
The Challenge
Modernizing the urban lighting system scattered across numerous thoroughfares. The project faced an ultra-short completion deadline of exactly 45 calendar days.
The Solution
Fast-track execution. We mobilized specialized electrical technical squads to work in parallel across various city zones. The project was decisively finalized on December 24, 2021, with comprehensive daily logs and 100% functional testing.

Renovation of BBMKG Region IV Service Building
Client
Meteorology, Climatology, and Geophysical Agency
Value
IDR 2,449,367,000
Location
Makassar City
Year
2020
The Challenge
Enhancing the structural viability of a high-risk national meteorological observation institution. This demanded strict adherence to technical specifications and time management throughout the 150-calendar-day execution.
The Solution
Execution founded on absolute Quality Assurance. The project was meticulously supervised, earning an 'Excellent' (85.25) Performance Assessment score from the Committing Officer. We guaranteed material availability and a zero-accident workplace.

Installation of 630 kVA Transformer at Lamaddukelleng Hospital
Client
RSUD Lamaddukelleng, Wajo Regency
Value
IDR 1,193,000,000
Location
Sengkang, Wajo Regency
Year
2025
The Challenge
Healthcare facilities operate on a 0% power downtime tolerance. The installation of a medium-voltage 630 kVA Transformer and Cubicle system demanded absolutely flawless electrical load engineering.
The Solution
We deployed certified Electrical Managerial Personnel to execute the substation integration within a fast-tracked 30-day window. Comprehensive testing was conducted before synchronizing power to the hospital grid.

Rehabilitation of STIA LAN Polytechnic Campus
Client
STIA LAN Polytechnic Makassar
Value
IDR 1,181,415,500
Location
Makassar City
Year
2020
The Challenge
Revitalizing concrete structures, architecture, sanitation, and electrical systems amid a global pandemic, with a contractual addendum extending the deadline to 107 calendar days.
The Solution
Tactical flexibility. We swiftly adjusted the BoQ through the Addendum while maintaining rigid OHS protocols. Structural and finishing works were handed over precisely on time with zero quality deviations.

Revitalization of SMPN 1 Panca Rijang Building
Client
Education Office of Sidenreng Rappang
Value
IDR 618,000,000
Location
Sidenreng Rappang Regency
Year
2021
The Challenge
Guaranteeing the structural safety of student classrooms funded by the Special Allocation Fund (DAK) for Education.
The Solution
Auditing the existing structure and replacing degraded architectural elements. Our technical evaluation ensured the final output passed a 100% feasibility test, confirmed through the FHO in April 2022.

Tourism Park Landscape Arrangement
Client
Tourism Office of Maros Regency
Value
IDR 542,710,000
Location
Maros Regency
Year
2022
The Challenge
Outdoor execution involving open-space land structuring and aesthetic landscape electrical installations within a tourism zone.
The Solution
Harmonizing robust outdoor civil durability with high aesthetics. We installed underground cable networks with superior waterproofing, concluding with a 100% physical handover in September 2022.

Balang Baru Neighborhood Road Pkg 58 & 56
Client
Makassar City Public Works Office
Value
IDR 935,904,794 (Total)
Location
Makassar City
Year
2025
The Challenge
Optimizing local roads in densely populated areas. Required demolishing concrete, compacting gravel, and laying f'c 25 MPa paving blocks with bishop-hat interlocks over damp terrain.
The Solution
Strict traffic management and full OHS implementation. Concrete block paving was executed simultaneously utilizing semi-mechanical methods, drastically minimizing soil settlement.